Provider's technicians dispatch date was changed to 20th April at 2PM local time. The scope of the work is to do the measurements of the dark fiber and determine the degradation place. Once completed, restoration works will be performed. .
Provider's technicians dispatch date was changed to 20th April at 2PM local time. The scope of the work is to do the measurements of the dark fiber and determine the degradation place. Once completed, restoration works will be performed. .
SMC monitored that services recovered since fiber splicing were partially completed last 18-Apr at 18:55 hrs UTC. However, a degradation alarm is still monitored on the dark fiber link. Provider reinvestigated and suspecting issues on the intermediate fiber segments. Fiber dispatch has been scheduled on 22-Apr at 00:00 hrs UTC to locate and restore the fault..
Equinix SMC received confirmation from dark fiber provider that fiber splicing is now in progress. Estimated time of restoration is on 18 April at 17:00 UTC. .
Equinix SMC received confirmation from dark fiber provider that fiber splicing is now in progress. Estimated time of restoration is on 18 April at 14:00 UTC. .
Service provider technicians have conducted a verification process and confirmed that they possess the appropriate wire necessary to successfully complete the splice. At present, the technicians are actively engaged in the cable pulling process, and once this task is accomplished, they will commence the splice work. Additionally, the technicians have devised a plan to reroute unaffected customers, although no official confirmation has been provided regarding its implementation at this time. The service provider has confirmed there technicians are prepared to work through the night to resolve this outage..
Service providor technicians are currently engaged in a comprehensive assessment of the damage and strategizing on how to proceed with the splice completion. A conference call has been scheduled to discuss the fiber inventory and outline the repair process. The estimated time of repair (ETR) for the fiber is by the end of business on 4/18. The service provider anticipates providing a more precise ETR following the conference call..
Provider's Transport Team has confirmed that there is no possibility to re-route the traffic to another working fiber pair. Cable Team is still working to find and repair fiber cut. ETR remains unknown. .
Dark fiber Provider technicians team is working to resotre the fiber. Splicing was not started yet and the ETR reamins unknown. Further updates will be shared as soon as possible. .
Equinix SMC confirmed with dark fiber provider that they are experiencing fiber cut on the link and they have dispatched a technician to further investigate. No ETR has been provided as yet..
Equinix Fabric Metro Remote port and Unprotected Metro Connect circuits experience service interruption while Protected Metro Connect circuits experienced 50ms switching hit. Equinix engineers are investigating issue. .